
Unprofessional pays the price
In March 2018, we subcontracted a local wielding team to build a 5 meter metal stand to hold 5000 liter water tank in our farm. It took them almost two weeks to complete the project.
In March 2018, we subcontracted a local wielding team to build a 5 meter metal stand to hold 5000 liter water tank in our farm. It took them almost two weeks to complete the project.